Project Info
  • Construction Date: 2014/01
  • Location: Abadan
  • Category: Pipeline
Project Details

The pipeline is designed to transfer the product to Refinery. Instrument part is completely done by E.G.Dena. 2011/05 to 2014/01.

More Project Details

The pipeline is designed to transfer the product to Refinery. Instrument part is completely done by E.G.Dena. 2011/05 to 2014/01.