Project Info
- Construction Date: 2014/01
- Location: Abadan
- Category: Pipeline
Project Details
The pipeline is designed to transfer the product to Refinery. Instrument part is completely done by E.G.Dena. 2011/05 to 2014/01.
More Project Details
The pipeline is designed to transfer the product to Refinery. Instrument part is completely done by E.G.Dena. 2011/05 to 2014/01.