Project Info
- Construction Date: 2007/10
- Location: Cheshmeh Khosh
- Category: Oilfield
- Cheshmeh Khosh Oilfield Project : Increasing the production capacity of oilfield from 45,000 to 135,000 barrels per day. Instrument Detail Engineering is done and completed by E.G.Dena. 2006/09 to 2007/10.
Project Details
Increasing the production capacity of oilfield from 45,000 to 135,000 barrels per day. Instrument Detail Engineering is done and completed by E.G.Dena. 2006/09 to 2007/10
More Project Details
Increasing the production capacity of oilfield from 45,000 to 135,000 barrels per day. Instrument Detail Engineering is done and completed by E.G.Dena. 2006/09 to 2007/10